
Groupe Procado
New factory since May 26
Our new industrial site: Nearly 5,000 m² dedicated to production and storage: a new, modernised industrial facility, with a CSR approach integrated right from the design stage, and increased capacity to support our growth.
To support our growth, we will be opening our new Home Fragrance production site in May.
Nearly 5,000 m² divided into:
- 3 halls: 1 wax hall, 1 liquid hall, and 1 packaging hall
- An on-site quality/R&D laboratory for development testing
- Approximately 10 offices and 1 meeting room
- 2 loading docks for heavy goods vehicles
- Additional storage space beyond our existing facilities.
Advantages:
- Streamlined and expanded space to accommodate new machinery and double production
- Improved working conditions (more light, greater comfort, purchase of small equipment) for better organization, productivity, and quality
- Streamlined storage and stock categorization using QR codes for faster order processing and simplified inventory management
- Time savings during loading and unloading
- Controlled energy costs thanks to the installation of photovoltaic panels
